The Comprehensive Plan of Gas Delivery to Golgohar Mining and Industrial Complex
The purpose for this plan is gas delivery to Golgohar industrial complexes including: Jahan Foulad factories, Iron and Steel development , Gondeleh Sazi, Gohar Zamin, Foulad-e Iranian as well as 1000 MW Goharan combined cycle power plant.
This gas delivery grid consists of 46 kilometers of steel gas delivery with the diameter of 2 to 24 inches with pressures of PSI 400 and PSI 250 together with 12 gas pressure-regulating and metering stations, and one cathodic protection station.
The first and second phases have been operated in the years 2014 and 2015 respectively.