Company’s Activities

  • the Project of Constructing Gohran 1000 MW Power Plant

    The purpose of implementing this plan is the provision of backing of the electricity power required for the development plans of Golgohar mining and industrial company...

    Read more

  • the Project of Constructing 400 KV Lines of Golgohar Mining and Industrial Complex

    In line with the comprehensive plan of providing electricity required for the development plans of the companies located in Golgohar mining and industrial zone, and based on the studies carried out, and the plan made by Gohar Energy Sirjan company...

    Read more

  • the Project of the Construction of 230 KV Lines of Golgohar Mining and Industrial Complex

    In line with the comprehensive plan of providing electricity required for the development plans of the companies located in Golgohar mining and industrial zone, and based on the studies carried out and the plan made by Gohar Energy Sirjan company...

    Read more

  • the Comprehensive Plan of Gas Delivery to Golgohar Mining and Industrial Complex

    The purpose for this plan is gas delivery to  Golgohar industrial complexes including: Jahan Foulad factories, Iron and Steel development, Gondeleh Sazi, Gohar Zamin, Foulad-e Iranian as well as  Goharan 1000 MW combined cycle power plant...

    Read more

  • Water and Wastewater Projects

    Considering an increase in the production capacity in Golgohar mining and industrial zone in the form of implementing development plans, the provision of required water for the plans was assigned to Gohar Energy Sirjan company...

    Read more

  • the Implementation of 400 to 230 KV Power Plant substation of Golgohar

    This post is currently under construction in a land with an approximate area of 30 hectares including two voltage levels of 400 and 230 KV by Parsian High Pressure substations Development Company...

    Read more