GOHAR ENERGY SIRJAN Co.

The Comprehensive Plan of Gas Delivery to Golgohar Mining and Industrial Complex

The Comprehensive Plan of Gas Delivery to Golgohar Mining and Industrial Complex The purpose for this plan is gas delivery to  Golgohar industrial complexes including: Jahan Foulad factories, Iron and Steel development , Gondeleh Sazi, Gohar Zamin, Foulad-e Iranian as well as 1000 MW Goharan combined cycle power plant. This gas delivery grid consists of 46 […]

The Project of the Construction of Gohar Zamin 230 to 33 KV Post

The Employer: Gohar Zamin Iron Ore Company The Management of the Plan: Gohar Energy Sirjan Company Considering the newly-established Gohar Zamin company’s need, the contract for constructing a 230 to 33 KV post with the capacity of 2*145 MW Ampere under EPC was assigned to the qualified companies, and its first phase has already been […]

Water and Wastewater Projects

Considering an increase in the production capacity in Golgohar mining and industrial zone in the form of implementing development plans, the provision of required water for the plans was assigned to Gohar Energy Sirjan company. According to the estimation made, approximately 60 million cubic meters of water required for consumers must be annually provided via […]

The Project of the Construction of 230 to 33 KV post of Golgohar 2

The Employer: Golgohar Mineral and Industrial Company The Management of the Plan: Gohar Energy Sirjan Company For the purpose of increasing the production capacity of Golgohar Mineral and Industrial company in the shape of implementing the development plan of Gondoleh and Constantreh section, and after conducting the necessary studies by the engineering unit of Gohar […]

The Project of Constructing 400 KV Lines of Golgohar Mining and Industrial Complex

In line with the comprehensive plan of providing electricity required for the development plans of the companies located in Golgohar mining and industrial zone, and based on the studies carried out, and the plan made by Gohar Energy Sirjan company, the executive operations of 400 KV, 2-circuit , transfer lines with kerlow conductor for the […]

The Implementation of 400 to 230 KV Power Plant Substation of Golgohar

This substation is currently under construction in a land with an approximate area of 30 hectares including two voltage levels of 400 and 230 KV by Parsian High Pressure substations Development Company. 400 KV switch gear of this substation consists of eighteen 400 KV feeders (line, trans  and power plant), and eight 230 KV feeders […]

The Project of Constructing 1000 MW Gohran Power Plant

Technical Specifications of the Power Plant at a Glance: Technical Specifications 1 capacity of each gas station(ISO conditions)  166 MW 2 capacity of each steam station(ISO conditions)  160 MW 3 total capacity of the power plant 492 MW 4 location of the power plant 50 kilometers from Sirjan on the road to Shiraz 5 the […]

In the presence of minister of energy
the gas section of Goharan power plant was inaugurated;

In  the evening of a Thursday, February 1 2018, in  the video conference of the ceremony of simultaneous inauguration of projects of Golgohar mining and industrial complex, and infrastructure and economic plans, Reza Ardakanian said: “During the 12th administration, a capacity of 20000 MW was operated, and today is the so-called day of electricity and energy […]